Current Affairs State

Foundation Stone Of Naitwar Mori Hydro Electric Project Laid In Uttarakhand

Category : State

 R K Singh, Minister of State (IC) for Power and New & Renewable Energy, laid the foundation stone of the 60 MW Naitwar Mori Hydro Electric Project (NMHEP) along with Uttarakhand Chief Minister Shri Trivendra Singh Rawat in Uttarkashi. The Proposed NMHEP is located on the river Tons – a tributary of the Yamuna, in Uttarkashi district of Uttarakhand. This run-of-the river project was allocated to SJVN Ltd by the Government of Uttarakhand.  SJVN Ltd is a Mini Ratna PSU under administrative control of the Ministry of Power, Govt. of India.
Technical details of the Project:
 
  • NMHEP envisages construction of 30.50 m high barrage located at d/s of the confluence of Rupin and Tons rivers at village Naitwar, 4.33 km long Head Race Tunnel having 5.6 m dia., 51.65 m deep surge shaft with a dai of 18 m.
  • The project utilizes a net head of 90.76 m. to generate 265.50 MU in a 90 per cent dependable year.
Source- The Hindu Business Line


You need to login to perform this action.
You will be redirected in 3 sec spinner