Answer:
Let
number of packages of nuts produced = x
and
number of packages of bolds produced = y
The
number of hours for producing 1 unit of each item is given below :
Therefore
the above LPP is given as
Maximize,
P = 17.50 x + 7y, subject to constrains
x
+ 3y
L1
: x + 3y = 12 L2 : 3x + y = 12
Here
P is maximum at E (3, 3)
Number of Nuts
= 3
Number
of Bolts = 3