Railways NTPC (Technical Ability) Metal Forming, Casting and Cutting Question Bank Metal Forming

  • question_answer
    Consider the following steps involved in hamrner forging a connecting rod from bar Stock
    1. Blocking                    
    2. Trimming
    3. Finishing                   
    4. Fullering
    5. Edging
    Which of the following is the correct sequence of operations?

    A) 1, 4, 3, 2 and 5 

    B) 4, 5, 1, 3 and 2

    C) 5, 4, 3, 2 and 1 

    D) 5, 1, 4, 2 and 3

    Correct Answer: B


You need to login to perform this action.
You will be redirected in 3 sec spinner