    Match List-I with List-II and select the correct answer using the code given below the lists:
    List-I (Technique) List-II (Suitable for)
    A. Time study        1. Short-cycle nonrepetitive jobs
    B. Work sampling       2. Manual operations
    C. Analytical estimation 3. Short-cycle repetitive jobs
    D. MTM  4. Long-cycle jobs/ heterogeneous operations/operations involving team work
    Codes:

    A) A\[\to \]2, B\[\to \]4, C\[\to \]1, D\[\to \]3

    B) A\[\to \]3, B\[\to \]1, C\[\to \]4, D\[\to \]2

    C) A\[\to \]2, B\[\to \]1, C\[\to \]4, D\[\to \]3

    D) A\[\to \]3, B\[\to \]4, C\[\to \]1, D\[\to \]2

    Correct Answer: D