Railways NTPC (Technical Ability) Metrology and Inspection Question Bank Metrology and Inspection

  • question_answer
    Work study is mainly aimed at:

    A) Determining the most efficient method of performing a job

    B) Establishing the minimum time of completion

    C) Developing the standard method and standard time of a job

    D) Economizing the motions involved on the part of the worker while performing a job.

    Correct Answer: A


You need to login to perform this action.
You will be redirected in 3 sec spinner