Railways NTPC (Technical Ability) Metrology and Inspection Question Bank Metrology and Inspection

  • question_answer
    Determination of standard time in complex job system is best done through:                     

    A) Stop watch time study                

    B) Analysis of micromotion             

    C) Group timing techniques              

    D) Analysis of standard data system. 

    Correct Answer: A


You need to login to perform this action.
You will be redirected in 3 sec spinner