Railways NTPC (Technical Ability) Metrology and Inspection Question Bank Metrology and Inspection

  • question_answer
    Given that E =Earnings, R = Rate per hour, T = worked in hours, S = Standard time on the basis of date in hours. Rowan wage incentive plan is:

    A) \[E=RT+\left( \frac{S-T}{S} \right)R\]

    B) \[E=RT+(S-T)R\]

    C) \[S=0.98\,\,or\,\,98%\]

    D) \[E=RT+\left( \frac{S-T}{S} \right)RT\]

    Correct Answer: D


You need to login to perform this action.
You will be redirected in 3 sec spinner