    Match List-I with List-II and select the correct answer using the codes given below the lists:
    List-I List-II
    A.  OC curve     1. Acceptance sampling
    B. AOQL 2. Dodge rooming table
    C. Binomial distribution 3. P-charts
    D. Normal curve         4. Control charts for  variables
    Codes:

    A) A\[\to \]1, B\[\to \]2, C\[\to \]3, D\[\to \]4

    B) A\[\to \]1, B\[\to \]3, C\[\to \]2, D\[\to \]4

    C) A\[\to \]4, B\[\to \]2, C\[\to \]3, D\[\to \]1

    D) A\[\to \]4, B\[\to \]3, C\[\to \]2, D\[\to \]1

    Correct Answer: D