Railways NTPC (Technical Ability) Tool Engineering Question Bank Tool Engineering

  • question_answer
    Match List-I (Scientist) with List-II (Research work) and select the correct answer using the codes given below the lists:
    List-I List-II
    A. Schewart 1. Less function in B. Taguchi quality
    B. Taguchi  2. Queuing model.
    C. Erlang 3. Zero defect
    4. Control charts
    Codes:

    A) A\[\to \]3, B\[\to \]1, C\[\to \]2

    B) A\[\to \]4, B\[\to \]3, C\[\to \]1

    C) A\[\to \]3, B\[\to \]1, C\[\to \]2

    D) A\[\to \]4, B\[\to \]4, C\[\to \]1

    Correct Answer: B


You need to login to perform this action.
You will be redirected in 3 sec spinner