Answer:
Work done
i.e.
Work done =
i.
e. Work done = (9 x 109) (8 x 10?3)
(?2
x 10?9)
Since
electrostatic work does not depend upon actual path, so point R is irrelevent
here.
You need to login to perform this action.
You will be redirected in
3 sec