List I (Types of Work Study) | List II (Features) | ||
A. | Method study | 1. | Standard time required to do a particular job |
B. | Motion study | 2. | Operational efficiency of the workers. |
C. | Time study | 3. | It helps in reducing the distance travelled by materials |
D. | Fatigue study | 4. | Achieve necessary rhythm |
A) A\[\to \]2, B\[\to \]3, C\[\to \]4, D\[\to \]1
B) A\[\to \]3, B\[\to \]4, C\[\to \]1, D\[\to \]2
C) A\[\to \]3, B\[\to \]4, C\[\to \]2, D\[\to \]1
D) A\[\to \]4, B\[\to \]3, C\[\to \]1, D\[\to \]2
Correct Answer: B
You need to login to perform this action.
You will be redirected in
3 sec