    Based on the given graph figure, the economic range of batch sizes to be preferred for general purpose machine (GP). NC machine (NC) and special purpose (SP) will be: Codes:

    A) GP\[\to \]2, NC\[\to \]5, SP\[\to \]4

    B) GP\[\to \]1, NC\[\to \]4, SP\[\to \]5

    C) GP\[\to \]3, NC\[\to \]2, SP\[\to \]4

    D) GP\[\to \]1, NC\[\to \]4, SP\[\to \]2

    Correct Answer: B

    Solution :

    GP = 1, NC = 4, SP = S