A can do a work in 10 days and B in 20 days. If they together work on it for 5 days, then the fraction of the work that is left, is [SSC (CGL) Pre 2015] |
A) \[\frac{3}{20}\]
B) \[\frac{4}{3}\]
C) \[\frac{1}{4}\]
D) \[\frac{3}{4}\]
Correct Answer: C
Solution :
Work done by A in one day \[=\frac{1}{10}\] |
Work done by B in one day \[=\frac{1}{20}\] |
Total work done by \[(A+B)\] in one day |
\[=\frac{1}{10}+\frac{1}{20}=\frac{2+1}{20}=\frac{3}{20}\] |
Work done by \[(A+B)\] in 5 days |
\[=\frac{3}{20}\times 5=\frac{15}{20}=\frac{3}{4}\] |
\[\therefore \] Fraction of the work that is left \[=1-\frac{3}{4}=\frac{1}{4}\] |
Alternate Method |
Work done in 1 day by A and B |
\[B=\frac{20+10}{200}=\frac{30}{200}=\frac{3}{20}\] |
Then, work completed in 5 days \[=\frac{3}{20}\times 5=\frac{3}{4}\] |
Left work \[=1-\frac{3}{4}=\frac{1}{4}\] |