Banking Sample Paper SBI PO (Main) Sample Test Paper-5

  • question_answer
    Direction: Study the given bar-chart carefully and answer the following questions.
    In which year was the electrification work done in maximum number of villages?

    A)  2012                           

    B)  2013

    C)  2014                           

    D)  2013 and 2012

    E)  2012 and 2014

    Correct Answer: A

    Solution :

    Number of villages where electrification was done in \[2012=50+30+60+40=180\] Number of villages where electrification was done in \[2013=20+40+50+50=160\] Number of villages where electrification was done in \[2014=40+30+40+60=170\] In 2012 maximum electrification work was done.