Direction (71-75): Study the following pie-chart carefully and answer the questions given below. Cost estimated by a family in renovation of their house Total estimated cost is Rs 1,20,000. |
A) 9.5%
B) 8.5%
C) 9%
D) 10.5%
Correct Answer: C
Solution :
Required difference = \[\frac{\left( 10200 \right)}{120000}\times 100=\]You need to login to perform this action.